make an existing task a subtask
I constantly think of things and then add to Dreamcatcher. Then, I'll have a group of things to do that are related. I sort tasks together so on my Daily Targets I'll have Big Task, Small Task 1, Small Task 2, etc. I then copy each small task and make it a subtask under Big Task. Would it be possible to add an overlay item that says this task belongs under this other task? Thank you.
-
Jean-Yves Lord commented
Indeed. That feature would a great!
-
Merl Miller commented
This is a terrific idea. I have the same problem. I just added 5 subtasks to a task with the pain in the backside copy and paste method described.
-
Merl Miller commented
It would be nice if these posts could be edited afterwards. Sorry about the missing words.